As the calendar flipped from March to April, last week, work continued on the exterior renovation of the Gateway 26 Casino Arcade.
The outline of the new marquee above the main entrance (at 26th & Boardwalk) is beginning to take shape. Redesign work is being done on the storefront facade of the entire block, between 25th & 26th Aves.
Click each photo for a larger view...
No comments:
Post a Comment